PROJECT LIST

EDUCATIONAL PROJECT LIST


WYOMING CITY SCHOOLS  - Cincinnati, Ohio
Master Plan
District Master Plan for new 100,000 sf 5-8 Middle School approved March 2012.
Wyoming Middle School Addition / Renovation
46,000 sf addition and 85,500 sf renovation to Historic 1927 Middle School, project in design phase and scheduled to be completed fall 2014.
Primary Schools
20,616 sf partial roof replacements to Elm and Hilltop Primary Schools. $284,000 project completed summer 2010.


NORTHMONT CITY SCHOOLS (OSFC) - Englewood / Clayton, Ohio  
Master Plan
$96M District Master Plan for a new 9-12 High School, a new PK-1 Primary School, and air conditioning to all elementary schools. Project approved by voters November 2011.
Northmont High School

$60M new 267,000 sf 9-12 High School.  Project in Design phase and scheduled to be complete fall of 2015.
Northmont Community Auditorium
$3 M; 1,152 seat turntable-divisible auditorium; completed September 1987
Sports Complex
$1.4 M; stadium, lighting, concessions building, locker rooms, grandstands and new seating; bleacher relocation from OR Edgington to the new High School. completed August 1986

MILTON-UNION EXEMPTED VILLAGE SCHOOLS  (OSFC)  West Milton, Ohio
New K-12 School - $45M, 216,600 sf K-12 campus. Project completed August 2012.


WASHINGTON COURT HOUSE CITY SCHOOLS (OSFC) – Washington Court House, Ohio District Master Plan
$75M master plan for the rebuild of the entire school district as part of the OSFC program.
Washington High School / Middle School $43M; new High School and Middle School. High School to house 573 students grades 9-12. 102,000 sf. Middle School to house 593 students grades 6-8, 85,000 sf. Project completed March 2009.
Belle Aire Intermediate School
$13.4M; new elementary school to house 612 students grades 3-5. 14,500 sf renovation plus 55,000 sf new construction. Project completed summer 2009. Cherry Hill Primary School
$16.6M; new elementary school to house 720 students grades PK-2. 83,000 sf project. Project completed summer of 2009.
 
Athletic Complex
New baseball stadium, softball stadium, varsity soccer field and practice field. $1.5M project completed spring of 2007
Demolition of Eastside Elementary School, Cherry Hill Elementary School, Belle Aire, and High School.



GREENEVIEW LOCAL SCHOOL DISTRICT  (OSFC) - Jamestown, Ohio
$33.3M District OSFC Master Plan completed November 2007. 
Greeneview High School
$3.8M renovation to existing (9-12) High School including air conditioning, technology, security, and sitework. Project completed August 2012.
New Middle School
$13.6M new (5-8) Middle School. 65,414 sf. 459 students. Project completed August 2012.


KETTERING CITY SCHOOLS - Kettering, Ohio
District Master Plan
· Existing facilities assessment of total District Facilities, 7,300 students, 15 buildings totaling 1.3 million square feet, completed 2002.
· $102M District master plan including additions and renovation to all school buildings in the district. The master plan led to a successful bond issue passage in 2002.
· District facilities assessment report. Completed 1996.
 
Fairmont High School
· $400,000 renovation of Media Center. Construction completed January 2010.
· $14M Additions and renovations including 3,650 seat James S. Trent Arena, wrestling room addition and PME upgrades to 150,000 sf of existing campus. Construction completed November 2005.
· $9M Additions and renovations including Performing Arts addition, recital hall, new administrative offices, science labs PME upgrades to 150,000 sf of existing campus. Construction completed January 2006.
· 330,000 sf roof replacement completed January 2006.
· $11.6M Additions and renovations including 32 classrooms, commons, gym, kitchen, and connecting corridor additions. Completed 1995.

Moraine Meadows Elementary School
· $2.3M Addition and renovations including administrative offices, media center, science lab and PME upgrades to existing building. Construction completed August 2005.
· $260,000 - 24,180 sf roof replacement completed 2007.


OAKWOOD CITY SCHOOLS - Oakwood, Ohio
District Master Plan

· Existing facilities assessment of total District Facilities, 2,200 students, 5 buildings totaling 300,000 square feet, completed 2002.
· $20.2M District wide master plan for additions and renovations to Smith Elementary, Harman Elementary, Oakwood High School and Junior High. The master plan led to a successful bond issue passage in 2002.

Oakwood High School / Junior High
· $10.2M (4) Additions and renovations; completed August 2005.
· $100,000 wood gym floor replacement. To be complete summer 2010.
· $50,000 Engineering Lab renovation. To be complete summer 2010.

Smith Elementary School
· $4.75M Addition and renovations; completed August 2004.
Harman Elementary School
· $5M Addition and renovations; completed August 2004.
· $50,000 Gymnasium Athletic Flooring replacement, completed December 2009.


DAYTON PUBLIC SCHOOLS  (OSFC)
Ruetschle Architects, part of the Dayton Design Collaborative served Dayton Public Schools as the executive architect for the $627M capitol improvements to Dayton Public Schools, 2001-2011.
EJ Brown PK-8
; $11M 73,000 sf school construction completed December 2008.

ARCHBISHOP ALTER HIGH SCHOOLS  - Kettering, Ohio 
Multi-phase Master Plan including renovation and addition to existing High School and site work. New construction to include a Performing Arts Center: 500 seat auditorium, music and theatrical classrooms, art room. $15M Project in on-going fundraising phase.
$3.3M Phase 1 project includes science lab renovations, food lab, chapel renovations, spirit shop, parking lot expansion, and lighted athletic field. Construction completed January 2010.


THE MIAMI VALLEY SCHOOL - Dayton, Ohio
Lafino Familty Athletic Center
$4M new main gymnasium and Middle School addition; completed August 2004.
Alumni Theatre $300,000 Black Box theatre renovation, completed 2008
Outdoor Classroom  at Lower School, completed fall 2009.
Campus Master Plan, completed summer 2010.
Green House in Design Phase, to be complete 2011.

CARROLL HIGH SCHOOL
 – Dayton, Ohio
$2.1M New gymnasium, wrestling room and future science classrooms. Completed 2003.


INCARNATION SCHOOL - Centerville, Ohio
$3.8 M; 43,000 sf, 19 classroom addition; completed September 1997


DAYTON CHRISTIAN SCHOOLS - Miami Township, Ohio
$5M master plan converting a former NCR training facility into a K-12 school. Completed August 2004.


TROY CHRISTIAN HIGH SCHOOL


EMMANUEL LUTHERAN SCHOOL
Master plan completed in 2002 for $2.2M 16,000 sf 8 classroom addition.


SPRING VALLEY ACADEMY
$2M Classroom addition and gym, completed 1998


DAYTON-MONTGOMERY COUNTY PUBLIC LIBRARY
Capital mprovement and Accessibility Renovation
$1.1 M work to 13 branch Libraries; completed December 1996



MIAMI UNIVERSITY On-going Small Projects 2010 – 2011. Ruetschle is serving Miami University on miscellaneous small projects.
Elevator Replacement at Harris Dining Hall.  $175,000, to be complete August 2011

Roudebush Hall, Oxford Campus
$6 M; 42,400 sf renovation / addition to administration building; completed February 2002
John D. Millet Hall
$2.5 M; 120,400 sf roof replacement and new curtain wall system; completed January 2002
McGuffey Museum Renovation
Construction administration services for the Smith Group; completed 2002.
Schwarm Hall and Harry T. Wilks Conference Center, Hamilton Branch Campus
$8.2 M; 70,250 sf new building; completed September 1997

Rentschler Hall Renovation, Hamilton Branch Campus
$1 M; 27,400 sf renovation of a classroom and office building; completed December 1997



WRIGHT STATE UNIVERSITY - Dayton, Ohio
College of Education and Human Resources  $7 M; 90,000 sf renovation; completed September 2000.
The Hangar  $1.8 M; New food service area; completed October 2000
Nischwitz Baseball Stadium $2 M; 700 seat baseball stadium; complete January 2000
University Hall
 $11.8 M; 100,000 sf Administration and Academic Building; completed March, 1999
Library Addition and Computer Center
 $6.6 M; 95,000 sf addition; completed September 1988
Rike Hall Business and Administration Building
 $4.75 M; 70,000 sf classroom and office building; completed August 1981



SINCLAIR COMMUNITY COLLEGE - Dayton, Ohio
Parking Garage, Phase II
$3.8 M parking structure, bringing garage total to 2,969 cars; completed March 1988
Parking Garage, Phase I
$6.5 M new parking structure; completed May 1983



___________________________________________________________________________


RELIGIOUS PROJECTS LIST


FAIRHAVEN CHURCH- Centerville, Ohio
$40,000 remodeling and creation of coffee shop / bookstore, completed September 2004.
$12M Master Plan for new Lobby Addition and Family Activity Center completed May 2007.
$8M Additions and Renovations completed 2010. 

$3M Preschool Addition in Design phase, scheduled to be complete Fall 2013.

WASHINGTON HEIGHTS BAPTIST CHURCH – Washington Township, Ohio 
Implementation of Phase 1 of master plan including multi-purpose gymnasium, stage, basement youth spaces, expanded foyer and kitchen. Project completed 2009.


CRESTVIEW PRESBYTERIAN CHURCH - West Chester, Ohio
$3.3 M, 27,200 sf New 800 seat sanctuary, Narthex, administrative offices. Project completed May 2003.


VINEYARD CHRISTIAN FELLOWSHIP - Beavercreek, Ohio
$1.2 M; 50,000 SF renovation of former Furrows lubber store into 1000 seat church auditorium, multi-purpose room, classrooms, and office space; completed December 2001.


CHRIST UNITED METHODIST CHURCH ACTIVITY CENTER - Kettering, Ohio
$3 M; Multipurpose gymnasium and classrooms; construction completed 1998.


PATTERSON PARK CHURCH - Beavercreek, Ohio
$12 M Master plan including new 1,200 seat sanctuary, narthex, and classroom addition.
Master plan complete September 2005. Schematic Design Phase completed of Sanctuary and Educational Wing in 2007.



FIRST PRESBYTERIAN CHURCH - Greenville, Ohio
$650,000 addition and renovation, completed January 1987. Building evaluation completed November 2000.


PEACE EVANGELICAL LUTHERAN CHURCH - Beavercreek, Ohio
$1.3 M, 13,000 SF, Classroom and narthex addition and renovations; completed August 1994.


SOUTHMINSTER PRESBYTERIAN CHURCH - Centerville, Ohio
$2.3 M; 27,000 SF multipurpose, administrative office and fellowship space addition.
Completed August 1993.



SOUTHGATE BAPTIST CHURCH - Springfield, Ohio
Master plan including new gymnasium, classroom addition, and administrative office expansion completed in 2003. 


ARCHBISHOP ALTER HIGH SCHOOL CHAPEL RENOVATION - Kettering, Ohio
Part of $3.3 M renovation to Alter High School. 2,350 sf including reservation chapel, and sacrisity. Completed January 2010.


ST. MARY CATHOLIC CHURCH – Springboro, Ohio
$6M master plan for new 50,000 sf church and parish center.  Project currently in planning phase.


ST. CHARLES BORROMEO CATHOLIC CHURCH - Kettering, Ohio
$3.7 M; 34,000 SF, new church, sanctuary seats 1,000; completed March 1993


ST. FRANCIS OF ASSISI PARISH
- Centerville, Ohio
Site work for the new sanctuary completed April 2004.


ST. JOHN THE EVANGELIST CATHOLIC CHURCH - West Chester, Ohio
$4 M; 30,000 SF new church, sanctuary seats 1200; completed October 1999



ST. GEORGE'S EPISCOPAL CHURCH - Centerville, Ohio
$260,000, Renovation for accessibility and Bell Tower Addition; completed October 1995.


ST. MARY'S CATHOLIC CHURCH - Greenville, Ohio
Study for planned expansion of parish worship facility; completed August 1996


ST. MAXIMILIAN KOLBE CATHOLIC CHURCH - Hamilton, Ohio
$4.7 M; 30,000 SF new sanctuary seating 1200, completed February 2002.


ST. PAUL CATHOLIC CHURCH - Englewood, Ohio
$1.2 M; 16,500 SF classroom, office and fellowship space addition, completed September 1990.


PRECIOUS BLOOD CATHOLIC CHURCH - Dayton, Ohio
$3.5 M, 22,760 SF, 900 seat sanctuary and chapel; completed July 2000.


CHURCH OF THE INCARNATION PARISH CENTER - Centerville, Ohio
$4.2 M; 37,500 sf New Parish Center; completed August 1994.
$3.8 M; school renovation and addition; completed September 1997.



OUR LADY OF IMMACULATE CONCEPTION PARISH - Dayton, Ohio
$48,600 ADA renovations to church and school; completed July 1996.
$172,000 school window replacement completed April 1996.
Parish facilities study completed April 1995.

____________________________________________________________________


INSTITUTIONAL PROJECT LIST


MONTGOMERY COUNTY 
Montgomery County Juvenile Justice Center 
$40M new 144 bed detention/Courts Building completed December 2007 
Montgomery County Child Care Center, Dayton 
$800,000 center for 130 children; completed September 1992 
Renovation of Montgomery County Courts Building, Dayton
$2.2 M renovation of courts and offices; completed April 1992
Montgomery County Parking Garage, Dayton
$4.1 M garage for 827 cars; completed February 1992
Dayton Montgomery County Courts Building, Dayton
$7.2 M; 104,000 SF new courts and office building; completed June 1989
Montgomery County Board of MRDD
Renovations to Jergens Adult Services Center,1991
$3M renovation for Liberty Center, to be completed fall 2010.
Montgomery County Residential Treatment Center


BUTLER TOWNSHIP
Government Center Master Plan
Police station, fire station, government center. Completed June 2007.
Fire Station 87 Master Plan, study for expansion. Completed in December 2005.
Fire Station 89 Master Plan, study for expansion. Completed in May 2007.
Fire Station 88, Little York Rd. $1.25 M, 11,500 SF residential, 4-bay facility; completed August 1989


CITY OF DAYTON
Fifth District Police Headquarters, Dayton
$997,000; 8,250 SF office and headquarters building; completed April 1991
Elevator Modernization at the Municipal Garage, 2001.


CITY OF WEST CARROLLTON
Service Garage. $970,000; 13,500 SF maintenance facility; completed September 1996


CITY OF KETTERING
North Building Renovation Project
$1M; 12,000 SF renovation of former courts building to house Administration Support, Human Services, Parks and Recreation and Tax Department. Construction completed Spring of 2008.


MIAMI COUNTY
Miami County Courthouse, Troy
$5.7 M; cast-iron dome and pavilion restoration, masonry and window restoration; completed July, 1998
Miami County Jail Exercise Facilities, Troy
West Central Juvenile Facility, Troy
$4.3 M; 39,500 SF detention and rehab. facility; completed October 1992
Engineers Office Building, Troy
$490,000; 4,300 SF office building; completed July 1990
Human Services Building, Troy
$1.1 M; 12,000 SF office building; completed June 1987

EASTWAY BEHAVIORAL HEALTH CARE
Eastway Behavioral Health Care Renovation, Englewood, OH. 1995
Eastway Behaviorial Heath Care Center Renovation, Dayton, OH 1995
Eastway Claridge Plaza, Twin Towers, Residential Treatment Center, Covington Housing 


TWIN VALLEY BEHAVIOR HEALTHCARE
Twin Valley Behavioral Healthcare Renovations
(Secure Mall Building 64, Toilet Room ADA Renovations), Dayton OH 2003
Renovations to Buildings 62, 64, 65, 66, 67, $894,000; misc. renovations; completed April 1993
New Administration Building, $664,000; 14,000 SF office building; completed June 1978 

DAYTON MENTAL HEALTH CENTER
Renovations to Buildings 62, 64, 65, 66, 67, $894,000; misc. renovations; completed April 1993
New Administration Building, $664,000; 14,000 SF office building; completed June 1978

DAYTON METROPOLITAN HOUSING AUTHORITY
Summit Court, Edgewood Court and Metro Annex security lighting
Wilkinson Plaza and Wentworth Hi-Rise fire alarm system upgrade

DAYTON & MONTGOMERY COUNTY PUBLIC LIBRARY
Dayton/Montgomery County Public Libraries ADA Assessment
Vandalia Branch Library parking lot expansion; completed 1994
Trotwood Branch Library. $560K; 10,000 SF branch library; completed October 1991
Capitol Improvements to the following libraries: Brookville, Vandalia, Fort McKinley, Trotwood, New Lebanon, West Carrollton, Burkhardt, Dayton View, East, EC Doran, Madden Hills, Westwood. 

U.S. POSTAL SERVICE
Huber Heights Postal Office - $900,000; 16,000 SF new branch; completed June 1985
___________________________________________________________________________


COMMERCIAL OFFICE BUILDINGS

CITY OF KETTERING NORTH BUILDING
$1 M; 12,000 SF; interior renovation; Completed September, 2008

MCSi CORPORATE HEADQUARTERS, Kettering, Ohio
$6.7 M; 75,000 SF new office building. Completed Jan. 2003.

HEAPY ENGINEERING CORPORATE HEADQUARTERS, Kettering, Ohio
$3.5 M; 41,000 SF new office building. Completed October 2001.

AT&T - GIS RENOVATION OF BUILDING 28, Dayton, Ohio
$6.5 M interior renovation, window replacement, and new parking lot; completed June 1994.

IRON WORKERS DISTRICT COUNCIL OFFICE BUILDING, Vandalia, Ohio
$1.3 M; 11,400 SF new office building; completed January 1991.

AMERICAN TOWER TRANSMITTER BUILDING, Dayton, Ohio 2000.

GRAPHICS CORPORATION, Dayton, Ohio
$3.2 M office addition; completed December 1989.

MISSION RESEARCH CORPORATION, Beavercreek, Ohio
$1.3 M; 12,000 SF new office and research lab building for Danis Development; completed May 1989.

NCR BUILDING 28, Dayton, Ohio
$5.3M renovation, window replacement and parking lot; completed November 1994

AMERICAN AGGREGATES CORPORATION, Greenville, Ohio
$370,000; Renovation of office building; completed February 1989.

CITIZENS FEDERAL, Dayton, Ohio
$4 M; 64,000 SF new office building for Danis Development; completed September 1988.

APPLE VALLEY OFFICE CENTER, Beavercreek, Ohio
$4 M; 60,000 SF new office building; completed July 1984.

SABRE SYSTEMS & SERVICE, INC., Miamisburg, Ohio
$1.2 M; 24,000 SF new office building; completed June 1983.

CENTRAL PRINTING COMPANY, Moraine, Ohio
$1 M addition and renovation; completed May 1982.

MIKE-SELL’S POTATO CHIP COMPANY, Dayton, Ohio
$553,000 corporate office addition; completed February 1981

MERCY HEALTH SYSTEMS – WESTERN OHIO, Springfield, Ohio
Tenant space build out; completed 1994

EASTWAY BEHAVIORAL HEALTHCARE, Englewood, Ohio
Tenant space build out; completed 1995

DRT, DAYTON RELIABLE TOOL, Kettering, Ohio
Interior Modifications; construction complete 2009

ADENA TOOL CORPORATION, Vandalia, Ohio
14,000 s.f. addition and interior modifications 2009


CENTRAL PRINTING COMANYDayton, Ohio
$870,000 New plant and offices, Addition to plant.

PLATT MANUFACTURING, Dayton, Ohio
New Corporate Office Building

PRINTING SERVICE COMPANY, Dayton, Ohio

84,000 s.f. New plant and offices,  Printing press installation 


LEGAL OFFICES

SCUDDER & ESLER FOR DANIS PROPERTIES
3,000 SF office renovation, Dryden II; completed August 1995.

GREEN & GREEN FOR DANIS PROPERTIES
5,500 SF Tenant build out, Citizens Federal Centre; completed February 1994.

PORTER, WRIGHT, MORRIS & ARTHUR
$274,000 office renovation; completed November 1987.

Bieble & French LLP

FINANCIAL

CORNERSTONE BRANCH BANK, Centerville, Ohio
3,500 SF Branch bank remodel for Cornerstone Bank; to be complete June 2001.

NATIONAL CITY MORTGAGE
31,000 SF office remodeling for Danis Properties, Newmark 6; completed 1994.

CITIZENS FEDERAL, EATON BRANCH, Eaton, Ohio
$260,000 bank and office renovation; completed December 1988.

CITIZENS FEDERAL OFFICE BUILDING, Dayton, Ohio
$4 M new office building; completed September 1988.

HUNTINGTON NATIONAL BANK, Dayton, Ohio
$144,000 remodeling of downtown offices; completed June 1986.

RETAIL


DAYTON ART INSTITUTE MUSEUM STORE, Dayton, Ohio
1,070 SF tenant build out, Citizens Federal Centre; completed January 1994.

WAGON-LITS TRAVEL
1,423 SF tenant build out, Citizens Federal Centre; completed December 1993.

THE GRILL
1,331 SF remodeling, Citizens Federal Centre; completed September 1993.

D.H. PEER MEN’S STORE
1,095 SF remodeling, Citizens Federal Centre; completed September 1993.

BOOKS & CO
2,050 SF tenant build out, Citizens Federal Centre; completed July 1993.